How to install laminate flooring over a subfloor

Lay a floating laminate floor yourself by preparing the subfloor, adding underlay, and clicking planks together. It suits beginners with basic DIY tools. You need a flat, dry, clean subfloor and a day to let the floor settle before use.

YouTube video: How to install laminate flooring #foryoupage #construction #DIY #remodel #flooring

YouTube’s video details do not confirm captions. Check CC in the player for available tracks.

Other videos for this task

Video length
1 min 18 s
Time to do it
1 day
Difficulty
Medium
Steps
9

What you need

Steps

  1. Clear the room and remove the old flooring. Sweep the subfloor and check it is flat, dry and free of nails or bumps.

  2. Let the laminate packs sit in the room for 48 hours so the planks adjust to the room's temperature and humidity.

  3. Roll out the underlay across the floor, butt the seams and tape them. Leave a small gap at walls.

  4. Start in a corner and lay the first row with the tongue facing the wall. Put spacers between the planks and the wall for the expansion gap.

  5. Click the next plank into the short end of the first at an angle, then press it down until it locks.

  6. Cut the last plank of each row to length with a saw, leaving the expansion gap at the wall.

  7. Stagger the joints by starting each new row with a cut-off piece at least 30 cm long.

  8. Use a tapping block and mallet to close tight joints, and a pull bar for the last row near the wall.

  9. Remove all spacers, fit skirting boards or edge trim, and leave the floor for 24 hours before moving furniture back.

Tips and common mistakes

Wear knee pads and gloves, and lift planks with your legs, not your back.

Keep a consistent 8 to 10 mm expansion gap at every wall or the floor can buckle.

Check the subfloor moisture first; laminate swells if it sits on damp concrete.

Questions

Do I need glue for laminate flooring?

No. Most laminate is a floating floor that clicks together and sits on underlay without glue.

Can I install laminate over concrete?

Yes, if the concrete is dry and flat. Test the moisture and use a suitable underlay with a damp-proof layer.

How long before I can walk on it?

You can walk on it right after installation, but wait about 24 hours before moving heavy furniture back.

The notes are drafted automatically from video details and general task knowledge. How the guide was prepared

Report a correction

More in Home & DIY

See all