How to board a loft with a LoftZone raised floor kit

A raised flooring system lets you board a loft without squashing the insulation underneath. You fix supports to the ceiling joists, lay cross beams and screw boards on top. It suits confident DIYers with a clear loft and a helper for lifting boards.

YouTube video: LoftZone loft boarding install: Boarding and project completion

Caption availability is unknown. Check the CC control in the YouTube player.

Video length
1 min 22 s
Time to do it
Half a day
Difficulty
Medium
Steps
9

What you need

Steps

  1. Clear the loft and check the ceiling joists are sound. Measure the spacing between joist centres, usually 400mm or 600mm, and buy a kit that matches.

  2. Top up the loft insulation to about 270mm deep, keeping it level and away from cables and downlights. Wear a dust mask and gloves.

  3. Mark each joist position on the insulation or with a chalk line so you can find the timber again once it is covered.

  4. Screw the LoftZone legs to the joists at the spacing given in the kit instructions, usually every 600mm along each joist.

  5. Lay the cross beams into the legs so they run at right angles to the joists, and check each one sits level.

  6. Fix the beams down with the supplied screws, working from one end of the loft to the other.

  7. Lay the first board across the beams and screw it down with 4 to 6 screws per beam. Leave a 3mm gap between boards.

  8. Stagger the next row so the joints do not line up, then cut the final boards to fit around the hatch and any pipes.

  9. Walk only on the finished boards, and fit an edge stop or rail where the boarded area ends.

Tips and common mistakes

Never stand between the joists before the boards are down, only on the joists or finished floor.

Keep insulation clear of downlights and extractor fans so they do not overheat.

Leave a small gap at the eaves so air can still move through the roof space.

Questions

Does boarding a loft squash the insulation?

It does if you screw boards straight to the joists. A raised system lifts the boards so the insulation keeps its full depth and still does its job.

How much height does a LoftZone kit add?

Most kits raise the floor by roughly 250mm to 300mm, which is enough to clear standard insulation. Check the kit spec before you buy.

Can I do this alone?

The legs and beams are manageable solo, but loft boards are awkward and heavy. A second person makes lifting and lining up boards much easier.