You will learn how to tile a kitchen splashback from bare wall to grouted finish, a job that suits a confident first-time tiler. It covers setting out, cutting around sockets and sealing to the worktop. You need a sound, flat wall and basic tiling tools.
YouTube video: Part 1: Tiled kitchen splashback renovation #tiling #kitchen #splashback #diy #homeimprovement
Caption availability is unknown. Check the CC control in the YouTube player.
- Video length
- 1 min 39 s
- Time to do it
- 1 day plus overnight drying
- Difficulty
- Medium
- Steps
- 9
What you need
Steps
Turn off the power to the kitchen sockets at the consumer unit. Strip off the old tiles and any loose plaster, then sand the wall back to a sound, flat surface.
Measure the width and height of the splashback and plan your layout. Mark a centre line and dry lay a row of tiles with spacers so you avoid thin slivers at the corners.
Wipe the wall free of dust and prime it with a tiling primer. This helps the adhesive grip, especially on plasterboard or painted surfaces.
Spread adhesive with a notched trowel over one small section, about a square metre. Comb it in one direction so the ridges sit evenly.
Press the first tile into the adhesive with a firm twist so it beds fully. Add spacers at the edges and check each row with a spirit level.
Cut edge tiles with a manual cutter or wet saw. Around sockets, keep the power off, loosen the faceplate and notch the tile so it fits around the box.
Let the adhesive set for at least 24 hours before grouting. Pull out the spacers once the tiles hold firm.
Push grout into the joints with a rubber float, working diagonally. Wipe off the excess with a damp sponge before it dries on the tile face.
Run a bead of silicone sealant along the join between tiles and worktop, then smooth it with a sealant tool. This keeps water out of the gap.
Tips and common mistakes
Wear eye protection and plug cutting tools into an RCD, and keep the circuit off while you work around sockets.
Mix powdered adhesive in small batches so it does not go off before you finish the section.
Do not grout for at least 24 hours after the last tile goes on, or the joints can crack.
Buff the tiles with a dry cloth once the grout haze has gone to avoid streaks.
Questions
Do I need to remove the old splashback first?
Yes if it is tiled or the upstand is loose. Tiling over old tiles only works when they are firmly stuck and flat, and it leaves a bulky edge.
How many tiles do I need?
Measure the width and height in metres, multiply them to get the area, then add about 10 percent for cuts and breakages.
Can I tile straight onto painted plaster?
Only if the paint is sound and not flaking. Sand it back, prime the wall and use a suitable adhesive, or the tiles may lift.
The notes are drafted automatically from video details and general task knowledge. How the guide was prepared
Report a correction


