You will load your ledger and budget, compare actual net income against plan, and break the gap into volume, price, customer and cost variances. Then you write a short commentary that explains the numbers. It suits bookkeepers, controllers and small firm accountants closing the month.
YouTube video: Why Is Actual Not Budget? Variance Analysis with AI
Caption availability is unknown. Check the CC control in the YouTube player.
Choose a chapter (11)
- Video length
- 4 min 56 s
- Time to do it
- 1 hour
- Difficulty
- Medium
- Steps
- 8
What you need
Steps
Close the month in your ledger first, then export the general ledger for the period. Use account codes that match your budget so the two files line up line by line.
Load the budget and the latest forecast into the same structure. Keep the same account codes, periods and sign conventions so nothing lands in the wrong row.
Have a second person check and approve the loaded ledger, budget and forecast before you analyse anything. A quick sign-off here saves hours of chasing bad numbers later.
Compare net income actual against budget. In the demo the actual was 897,301 against a budget of 1,229,015, which is 331,714 unfavourable, so the gap is easy to read at a glance.
Split the sales variance into volume and price. Volume shows how much you sold, price shows what you charged, and mixing them hides which one caused the miss.
Break the rest down by customer and by cost line. This shows whether one large account or one overspent cost centre is driving most of the variance.
Draft the commentary from the calculated variances, letting the tool write the first pass. Keep it to the few variances that matter and leave the small ones out.
Check every figure in the draft against the ledger before it goes anywhere. Edit the wording yourself, then send it to a reviewer for approval and sign-off.
Tips and common mistakes
Use one sign convention throughout, for example positive for favourable and negative for unfavourable, or readers will misread the report.
Write commentary for the three or four largest variances only, since a long list of small ones buries the real story.
Treat AI-drafted commentary as a first pass and verify each number against source data before anyone relies on it.
Load the budget before you start analysing so you never mix a revised forecast with the original plan.
Questions
What is the difference between a budget variance and a forecast variance?
A budget variance compares actuals with the original approved plan. A forecast variance compares actuals with the latest reforecast, which is usually closer to what you now expect.
How big does a variance need to be before I explain it?
Set a threshold, such as a fixed amount or a percentage of the line, and explain anything above it. Most teams use around 5 to 10 percent plus a dollar floor.
Can I do this in a spreadsheet instead of paid software?
Yes. Export the ledger and budget as CSV files and use a lookup or pivot table to match accounts, then calculate the differences the same way.
The notes are drafted automatically from video details and general task knowledge. How the guide was prepared
Report a correction


