This guide shows you how to plan a shower wall tile layout and set a straight, level first row. It suits a confident beginner working over waterproofed cement board or a tile backer. You need a wet saw, thin-set mortar, a 1/4 inch notched trowel and a leveling system, and the wall must be flat and waterproof before you start.
YouTube video: How To Tile A Shower Pt. 1 - Layout And Starting First Row
Caption availability is unknown. Check the CC control in the YouTube player.
- Video length
- 8 min 1 s
- Time to do it
- 3 to 4 hours
- Difficulty
- Medium
- Steps
- 9
What you need
Steps
Check that the shower wall is waterproofed, flat and free of dust. Fix any low or high spots before you plan the tile, because the first row follows the wall, not the other way around.
Find the lowest point around the shower floor or tub. Measure up one full tile plus a grout joint from that point and draw a level line across the wall.
Dry-lay a row of tiles along the floor to plan the layout. Mark the centre of the wall and shift the layout so you avoid narrow slivers at the corners.
Draw a plumb centre line. Aim for cut tiles at both ends to be at least half a tile wide, then check the layout against the shower valve and corners.
Screw a straight ledger board along your level line. The board holds the first row steady while the mortar sets.
Mix thin-set mortar to a smooth, peanut butter consistency. Let it sit for 10 minutes, then mix again before use.
Spread mortar with the flat side of the 1/4 inch notched trowel, then comb ridges in one direction. Work in small sections so the mortar stays wet.
Back-butter each tile and press it into place with a slight twist. Add spacers or leveling clips and check the row with a level as you go.
Wipe excess mortar from the joints with a damp sponge. Let the mortar cure, then remove the ledger and cut the bottom row to fit.
Tips and common mistakes
Dry-lay the whole wall before mixing mortar so you can still change the layout without wasting a batch.
Comb the mortar ridges in the same direction every time and press each tile firmly to collapse the ridges.
Keep joints the same width and clean them as you go, because hardened thin-set is hard to remove.
Wear eye protection and gloves when cutting tile, and keep water away from the wet saw's electrical parts.
Questions
Do I start tiling a shower wall at the top or bottom?
Start with a level ledger board one row up from the bottom. That gives you a straight reference, and the bottom row is cut to fit last.
Can I tile straight onto drywall in a shower?
No. Use waterproof cement board or a sealed tile backer in wet areas, and tape and seal the joints before tiling.
How long before I can grout?
Let the thin-set cure for at least 24 hours, or follow the mortar bag's instructions. Don't grout while the tiles can still shift.
The notes are drafted automatically from video details and general task knowledge. How the guide was prepared