Lay a level row of bathroom wall tiles on a prepared wall. It suits beginners doing a small wall or splashback who have basic tiling tools. You need a flat, dry wall and a notched trowel for the adhesive.
YouTube video: How To Lay A Row Of Bathroom Wall Tiles #tiling #bathroom #diy #homeimprovement
Caption availability is unknown. Check the CC control in the YouTube player.
- Video length
- 1 min 1 s
- Time to do it
- 45 minutes
- Difficulty
- Easy
- Steps
- 8
What you need
Steps
Check the wall is flat, dry and clean. Fix any loose plaster and wipe off dust so the adhesive can grip.
Find the lowest point of the wall with a spirit level. Mark a level line one tile height above it so the bottom row stays straight.
Measure the width of the wall and plan the row so you do not end up with a thin sliver of tile at one end.
Spread adhesive on a small area with the notched trowel. Comb it in one direction to leave even ridges.
Press the first tile into the adhesive on your line and twist it slightly. Check it is level.
Push spacers into the gaps and set the next tile against them. Keep checking level as you go.
Cut the last tile to fit the end of the row with a tile cutter. Wear safety glasses when cutting.
Let the adhesive set, then remove the spacers and grout the joints with a grout float. Wipe off excess grout with a damp sponge.
Tips and common mistakes
Do not spread more adhesive than you can tile in about 20 minutes before it skins over.
Use the same spacer size throughout so the joints stay even.
Check level after every few tiles, not just at the end of the row.
Questions
Do I start tiling from the bottom of the wall?
Not always. Many tilers set a level batten or line one tile up from the lowest point so the bottom row can be cut to fit neatly.
How long before I can grout?
Leave the adhesive to set as the tub or bag says, usually around 24 hours, before you grout.
The notes are drafted automatically from video details and general task knowledge. How the guide was prepared
Report a correction


