How to install luxury vinyl plank flooring

Luxury vinyl plank flooring clicks together as a floating floor over a clean, flat subfloor. It suits beginners with basic hand tools. You need a level subfloor, an underlayment if required, and a plan for expansion gaps at the walls.

YouTube video: How to install lvp flooring #foryoupage #construction #DIY #remodel #flooring

YouTube’s video details do not confirm captions. Check CC in the player for available tracks.

Other videos for this task

Video length
1 min 33 s
Time to do it
1 day
Difficulty
Medium
Steps
10

What you need

Steps

  1. Clear the room and remove the old flooring. Sweep and vacuum the subfloor so no grit is left under the planks.

  2. Check the subfloor with a long straightedge. Fill low spots and sand high spots so the floor is flat within about 3 mm over 2 m.

  3. Roll out underlayment if your planks do not have a pad attached. Butt seams together and tape them.

  4. Measure the room width and divide by the plank width. If the last row would be under 5 cm, trim the first row narrower.

  5. Start in a corner with the tongue side facing the wall. Place spacers against the wall to leave an expansion gap.

  6. Click the next plank into the short end at an angle, then press it down flat. Tap the long edge with a tapping block, never directly on the plank.

  7. Stagger the joints by at least 15 cm between rows. Cut planks at the wall with a utility knife and a straightedge.

  8. Work row by row across the room, checking the gap at each wall as you go.

  9. Trim the last row to fit, leaving the same expansion gap. Pull out all spacers.

  10. Fit baseboards or trim over the gap. Do not nail through the planks.

Tips and common mistakes

Acclimate the boxes in the room for 48 hours before installing so the planks settle.

Keep the expansion gap at every wall and around pipes, or the floor can buckle.

Cut the plank face down with a sharp blade and score it several times for a clean edge.

Questions

Do I need underlayment for vinyl plank flooring?

Only if the planks do not come with a pad attached. A flat, clean subfloor is required either way.

Can I install vinyl plank over concrete?

Yes, if the concrete is dry, clean and flat. Test for moisture first and use a suitable underlayment.

How long does it take?

A small room takes a few hours. A full house can take a day or more, plus 48 hours to acclimate the planks.

The notes are drafted automatically from video details and general task knowledge. How the guide was prepared

Report a correction

More in Home & DIY

See all