Boarding a loft lets you store boxes without squashing the insulation below. This guide walks you through fitting a LoftZone StoreFloor raised frame on your trusses, then screwing boards on top. It suits confident DIYers and needs a drill, a helper and a free day.
YouTube video: DIY installation of LoftZone Loft Boarding system
Caption availability is unknown. Check the CC control in the YouTube player.
- Video length
- 13 min 29 s
- Time to do it
- 1 day
- Difficulty
- Medium
- Steps
- 8
What you need
Steps
Clear the loft and check your truss spacing, usually 600mm centres. Measure the length and width so you can work out how many supports, C channel and boards you need.
Mark the truss positions with a pencil. Plan rows of supports across the loft so the short ends of every board land on a support, not in mid air.
Screw the tri supports to the top of the trusses at the start and end of each run, then fix uni supports along the middle. Use the screws supplied with the kit.
Link the supports with aluminium C channel, screwing through the channel into each support. Check each row is level before moving on.
Repeat the rows at 600mm spacing until the raised frame covers the storage area. Keep the frame clear of the hatch and any pipes or cables.
Lay the first board on the frame and screw it down through the pre-drilled holes into the C channel. Butt the next board tight and stagger the joints.
Cut boards to fit at the edges and around trusses. Use a jigsaw for notches and a handsaw for straight cuts, and wear a dust mask.
Work safely: never stand on the bare ceiling between joists, keep your weight on the boards or a crawl board, and use a stable ladder to get in and out.
Tips and common mistakes
Never push insulation down to make boards fit; the raised frame exists so the insulation stays at full depth and keeps working.
Keep an air gap around recessed ceiling lights and don't bury cables, or you create a fire risk.
Get a helper for the first row, since long boards are awkward to hold and screw at the same time.
Don't overload the loft; boarding spreads weight but the ceiling is still designed for a limited load.
Questions
Do I have to remove the insulation first?
No. The StoreFloor frame raises the boards above the insulation, so you can leave the insulation in place at full depth.
How long does the install take?
A small loft takes about half a day. A full loft with lots of cutting around trusses can take a full day or more.
Can I walk on the finished boards?
Yes, the boards give a safe temporary walking and storage area. Don't treat it as a floor for heavy equipment or water tanks.
The notes are drafted automatically from video details and general task knowledge. How the guide was prepared
Report a correction


