Lay a hardwood plank floor over a clean, flat subfloor by working in rows and nailing through the tongue. It suits confident DIYers with a nailer and a few basic tools. Check that the subfloor is dry and level before you start.
YouTube video: How to install hardwood flooring #foryoupage #construction #DIY #remodel #flooring
YouTube’s video details do not confirm captions. Check CC in the player for available tracks.
- Video length
- 1 min 57 s
- Time to do it
- 1 to 2 days
- Difficulty
- Medium
- Steps
- 9
What you need
Steps
Clear the room and check the subfloor is dry, flat and free of debris. Fix any squeaks or loose boards before laying planks.
Let the planks sit in the room for a few days so they adjust to the humidity. Open a few boxes and stack them loosely.
Roll out the underlayment or moisture barrier across the floor. Overlap seams and tape them down.
Start along the longest straight wall. Place spacers between the planks and the wall to leave an expansion gap.
Face-nail the first row through the top of the boards near the wall. Set the nail heads with a nail set.
For each next row, fit the groove over the tongue at an angle and tap it tight with a mallet and tapping block.
Nail through the tongue at an angle so the nail is hidden by the next row. Keep rows staggered by at least 6 inches.
Measure and cut the last row lengthwise to fit, leaving the expansion gap at the far wall.
Remove the spacers and install baseboard or trim to cover the gaps. Sweep and clean the floor.
Tips and common mistakes
Leave an expansion gap of about 1/4 to 1/2 inch at every wall so the floor can move.
Stagger end joints between rows so the seams do not line up in a straight line.
Wear knee pads and safety glasses, and keep fingers clear of the nailer.
Acclimate planks for at least 48 hours to avoid gaps or buckling later.
Questions
Can I install hardwood over concrete?
Only with a moisture barrier and a flat, dry slab. Test the moisture level first, since trapped damp will damage the wood.
Do I need a flooring nailer?
A flooring nailer makes the job much faster and hides the nails. You can face-nail the first rows and rent a nailer for the rest.
How long should the wood sit in the room?
Let it acclimate for at least 48 hours, or longer for thick solid planks, before you install it.
The notes are drafted automatically from video details and general task knowledge. How the guide was prepared
Report a correction


