This guide walks you through setting a new squat pan over your floor drain, bedding it in mortar and sealing it so it does not rock or leak. It suits anyone replacing an old pan or fitting one in a new bathroom. You will need basic masonry tools, cement and a day for the mortar to cure.
YouTube video: WoW Excellent Replacement Toilet installation! How to install Indian toilet Seat In properly
Caption availability is unknown. Check the CC control in the YouTube player.
- Video length
- 8 min 33 s
- Time to do it
- 3 hours plus 24 hours curing
- Difficulty
- Medium
- Steps
- 10
What you need
Steps
Shut off the water supply to the cistern, flush the old pan dry, then break it out with a hammer and cold chisel. Wear gloves and eye protection, since broken ceramic is sharp.
Clear the old mortar from the floor and expose the drain pipe. Check that the new pan's outlet spigot will line up with the pipe opening without forcing.
Chip the floor down to the right depth so the pan rim finishes level with, or just above, the finished tile line. Allow about 25 mm for the mortar bed.
Mix a stiff bed of cement and sand at one part cement to four parts sand. Dampen the floor first so it does not pull water out of the mix.
Press the pan down into the mortar and push the spigot into the drain pipe. Fit a rubber sealing ring or a ring of cement slurry around the spigot to keep it watertight.
Check the pan with a spirit level in both directions and tap it down with a rubber mallet until it sits flat. Do not stand on it while the mortar is soft.
Connect the flush pipe to the inlet and tighten the joint by hand. Run a test flush now, before the mortar sets, to confirm water drains away freely.
Pack mortar into the gap all round the pan and smooth it with a float. Wipe off any mortar that gets on the pan face before it hardens.
Leave the pan for 24 hours to cure. Then tile and grout around it and run a bead of silicone sealant along the join between the pan and the floor.
Flush several times and check the base and the pipe joint for leaks or movement. Re-seal any damp spots before you use the pan normally.
Tips and common mistakes
Keep mortar out of the trap and drain pipe, or it will set hard and block the flow.
A pan that rocks after curing means the mortar bed was too thin, so lift it and start again.
Use a rubber mallet rather than a metal hammer to settle the pan and avoid chips.
Cure the mortar for a full day before anyone uses the toilet, or the bed will crack.
Questions
How long before I can use the new pan?
Wait at least 24 hours for the mortar to cure, and longer if the room is cold or damp. Test with a flush before normal use.
Do I have to break the floor to fit a new pan?
Usually only enough to match the depth of the new pan and its outlet. If the old pan and pipe positions match, the job is much smaller.
What stops smells coming from the drain?
The water trap built into the pan holds a seal of water. Make sure the pan is level and the trap is not blocked, or the seal will not form.
The notes are drafted automatically from video details and general task knowledge. How the guide was prepared
Report a correction


