You can silence a squeak in finished hardwood without lifting the boards or crawling under the house. This method injects heavy duty construction adhesive into the gap under the noisy board through two small holes, then hides the holes with filler. It suits anyone with a drill and a caulk gun.
YouTube video: I Fixed My Noisy Floor With Just One Trick!
YouTube’s video details do not confirm captions. Check CC in the player for available tracks.
- Video length
- 1 min 35 s
- Time to do it
- 45 minutes plus 24 hours dryin
- Difficulty
- Easy
- Steps
- 8
What you need
Steps
Walk slowly over the floor and press down on each spot that creaks. Mark every squeak with a small piece of tape so you can find it again.
Run a stud finder over the area to check for pipes and cables. Do not drill where metal or wiring sits close under the boards.
Drill two 3/16 inch holes about an inch apart at the squeak. Angle the bit slightly so it points toward the hollow gap under the board.
Load the construction adhesive cartridge into the caulk gun and fit the nozzle. Cut the tip so it fits snugly into your drilled holes.
Push the nozzle into the first hole and pump adhesive until it starts to show at the second hole. Stop there so you do not flood the floor.
Wipe any adhesive off the surface straight away with a damp cloth. Dried adhesive is much harder to remove from a finished floor.
Stack heavy books, weights or a water-filled bucket over the repaired spot. Leave the weight on for a full 24 hours while the glue cures.
Fill the two holes with wood filler and smooth it level with a putty knife. Sand lightly once dry and touch up the finish to match.
Tips and common mistakes
Test the method in a closet or under a rug first so you learn how much adhesive the gap takes.
Do not overfill the hole, because excess glue can push up between boards and spoil the finished surface.
Walk the floor again after the glue sets before you fill the holes, in case a second spot needs the same treatment.
Questions
Will this work if the squeak comes from the subfloor rubbing the joist?
Sometimes. The adhesive fills the gap between the board and whatever sits under it, so light movement stops. A loose joist may need a screw from below or a shim instead.
How long before I can walk on the floor?
Keep the weight on for about 24 hours and stay off the spot while the adhesive cures. After that you can sand and finish the holes normally.
Can I use this on carpet or laminate?
No. This method needs a bare wood surface you can drill and fill. For carpet, fix the squeak from underneath or use scored breakaway screws.
The notes are drafted automatically from video details and general task knowledge. How the guide was prepared
Report a correction


